|
This report includes two trips. Joel and I left on the 22nd of October and returned on the 24th. It started raining the night we arrived and continued the entire time we were there. We installed 9 Pure Water filtration systems and received requests for 5 more. We left about 10am on the 24th because we had heard that there had been mudslides the night before that had blocked the road out. Sure enough about 200yards before the bridge by the waterfalls there was a mudslide that was completely blocking the road. We returned to
On the 9th of November Joel, Josue, Lorenzo and I took the GMC. We left at 7am, spent some time in
These pics are of Pure Water Project recipients, road conditions and Azapac Amatal respectively To return to the pics page click here |
||||||
Pure Water Project |
||||||
Road conditions |
||||||
Azapac Amatal |
||||||